• English
  • 简体中文
  • Español
  • Français
  • Deutsch
  • Português do Brasil
  • العربية
  • 日本語
  • 한국어
  • Italiano
Success Story

Shenzhen Metro Line 14 Face Recognition Project – AI Access Control Display Terminals for Rail Transit

Client Shenzhen Metro
Product 10.1" Face Recognition PAD
Location Shenzhen, Guangdong, China
Shenzhen Metro Line 14 Project - MyWay-IT case study
Metro & Transportation
Project Overview

Bringing Smart Display to Metro & Transportation

This case study shows how MyWay-IT delivered a tailored smart terminal display solution for a real client in the field — engineered for reliability, visual impact, and measurable business results.

Field-proven deployment 24/7 stable operation Tailored to the site
200+
Units Deployed
99.8%
Recognition Accuracy
<0.5s
Response Time
50K+
Daily Users

What Problem Did We Solve?

Shenzhen Metro required a reliable, fast face recognition solution for Line 14 that could handle high passenger throughput (50,000+ daily users) while maintaining accuracy in varying lighting conditions and preventing fraud with photo/ video spoofing.

How We Solved It

MyWay-IT provided 200+ units of 10.1" Face Recognition PAD Displays with 3D living body detection and IR sensors. Our R&D team customized the UI to match Shenzhen Metro's branding and integrated with their existing access control backend. The solution included remote management software for centralized monitoring.

What Were the Outcomes?

Achieved 99.8% recognition accuracy with <0.5s response time. Reduced manual ticket checking by 60%. Successfully deployed across 18 stations on Line 14. Client renewed contract for Line 16 expansion.

Line 14 is one of Shenzhen Metros busiest eastern corridors, and the operator set a hard requirement: automatic gate entry at 50,000+ daily users per station cluster without compromising fraud resistance. Our 10.1″ face-recognition PAD was selected after a three-way hardware comparison.

What We Engineered for This Project

Each PAD integrates an RGB + IR dual-camera module running 3D liveness detection, which is what allows 99.8% recognition accuracy while rejecting printed-photo and video replay attacks. Panels run at 800 nits so they remain readable under station floodlights, and the housing is cold-rolled steel with sealed ports to survive 18-hour daily operation in a dusty transit environment.

Customization & Integration Work

Our R&D team rebuilt the stock Android UI to match Shenzhen Metros brand guidelines — boot animation, success/failure feedback states, and bilingual prompts — and developed a middleware layer connecting the devices to the operators existing access-control backend over their private network. A remote management console gives Line 14 staff live device health, firmware push and log export for every unit.

Timeline and Delivery Discipline

From purchase order to full operation took 3 months: 2 weeks for UI/integration development, 4 weeks for manufacturing with 72-hour burn-in on every unit, then staged station-by-station installation across 18 stations with our engineers on-site for the first deployments and 24/7 remote support thereafter. The client was satisfied enough to award us the Line 16 expansion.

Your Turn

Become Our Next Success Story

Join metro systems, universities, and enterprises worldwide who trust MyWay-IT for their smart display needs.

Send us an Email WhatsApp Instant Chat Get a Free Quote