Seoul Bus Station Renovation – Outdoor Double-Sided Digital Signage for Public Transit
Bringing Smart Display to Transportation & Smart City
This case study shows how MyWay-IT delivered a tailored smart terminal display solution for a real client in the field — engineered for reliability, visual impact, and measurable business results.
What Problem Did We Solve?
Modernize 200+ bus stops across Seoul with double-sided outdoor displays showing real-time bus arrivals, route information, and city announcements.
How We Solved It
We provided 55" double-sided outdoor displays with IP65 protection, automatic brightness adjustment, anti-reflective glass, and heating/cooling systems for Seoul's extreme weather. The displays integrate with Seoul's public transit API.
What Were the Outcomes?
Improved bus arrival accuracy perception by 60%. Reduced passenger inquiries at stations by 40%. System reliability of 99.9% over 2 years of operation. Won a Seoul Smart City Award.
Seouls citywide bus-stop modernization program required weatherproof, double-sided information displays at 200+ stops — a scale deployment where per-unit reliability matters more than almost any other specification, because service visits across a metro area of 25 million are costly.
Hardware for Four-Season Exposure
We supplied 400+ units (200 stops, double-sided) of 55″ outdoor displays engineered for Koreas climate: IP65 sealing against monsoon rain and fine dust, an automatic heating/cooling system keeping electronics within operating range from -25°C winter nights to summer sun-load, and anti-reflective glass with auto-brightness control from 800 to 2500 nits so arrival information stays legible against a low winter sun or midday glare.
Live Transit Data Integration
Each display integrates with Seouls public transit API, rendering real-time bus arrival predictions, service alerts and city announcements. Content and device health are managed centrally; the network operations team monitors every unit remotely with automatic alerts for any panel or temperature anomaly.
Scale Delivery, Measured Reliability
We manufactured and shipped 400+ units within 6 months, with our Korean partner handling installation and first-line service. Over 2 years of operation the estate has maintained 99.9% uptime, perceived arrival-time accuracy improved 60%, and station inquiries dropped about 40%. The project received a Seoul Smart City Award.
Become Our Next Success Story
Join metro systems, universities, and enterprises worldwide who trust MyWay-IT for their smart display needs.